Skip to content
Proudly Canadian. Serving Bolton and all of Caledon. Get a free quote
(289) 206-6479

The order of steps that keeps a Peel rebate claim valid

Peel Region pays part of the bill for a sanitary backwater valve in a Caledon house, and the order of the steps matters as much as the valve itself. The rules are short once they are laid out in sequence. Here is the order Plumbing Bolton follows on a Bolton job, and what the valve under your floor is for once the claim is paid.

Get a free quote

Optional, but it helps: we can confirm we serve your street and give you a realistic arrival time.

We reply by phone as soon as we can.

Key takeaways

  • Peel's rebate follows one order: licensed contractor, Town of Caledon permit, installation, inspection, then the claim with invoice, permit and record attached.
  • Only a valve installed after July 16, 2024 in a detached, semi or townhouse on its own lateral qualifies, once a decade per home.
  • The valve stops sewage coming back from the street sewer, and disconnected downspouts mean it has to close far less often.

What a backwater valve does under the floor

Your sanitary lateral runs from the house to Peel's sewer in the street. In a hard rain or a fast thaw the public sewer can fill beyond what it carries, and the surplus comes back up the laterals and out of the lowest fixture in the lowest house.

A backwater valve is a short fitting in the building drain with a flap that swings shut when flow comes from the street side, then drops open again once the surge has passed.

Step one, a licensed contractor and the Caledon permit

Peel accepts only a valve put in by a licensed contractor, so the first call is to a plumber who holds that licence. The second step is the Town of Caledon building permit, applied for before any concrete is broken.

The permit is what puts a Town inspector on the job, and Peel's conditions want that inspection on record ahead of the claim. A valve that goes in before the permit is issued puts the whole rebate at risk.

Step two, the install and the inspection

A camera pass locates the building drain, the slab is opened beside the foundation wall and the valve is cut in downstream of every fixture, with its lid flush with the new floor so it stays reachable. The inspector sees the open work before the floor is patched, and that record goes in your file.

To count, the valve must have been installed after July 16, 2024, which rules out any older valve already in place, and each home can claim once in ten years.

Who qualifies, and the downspout advice

The rebate covers a detached house, a semi or a townhouse whose sewer lateral serves that one home, so a building with several units on one line does not fit. Peel also strongly recommends disconnecting any downspout that feeds the sanitary sewer, which the plumber can do on the same visit.

Roof water is part of why the sewer surcharges, and a valve forced shut in every summer storm leaves your own drains with nowhere to go while it is closed.

Step three, the claim

Once the floor is closed and the inspector has signed off, the claim goes to Peel with the receipted invoice, the Town permit and the inspection record attached. The Region pays a share of the invoice up to a ceiling, and both figures sit on Peel's rebate page, so read them there.

Keep the access lid clear afterwards, since the flap wants a look and a rinse each year.

Related services

  • Mainline Backwater Valve Installation

    Need Mainline Backwater Valve Installation in Bolton? Plumbing Bolton installs and tests backwater valves for safer drainage. Book today.

  • Back Valve Government Rebate Program

    Need Back Valve Government Rebate Program help in Bolton? Plumbing Bolton installs and documents backwater valves for eligible rebate programs. Book an assessment.

  • Plumbing Government Grants & Rebates

    Need Plumbing Government Grants & Rebates in Bolton? Plumbing Bolton helps you plan qualifying upgrades and completes the work cleanly. Request an appointment.

  • Sewer Backup

    Need Sewer Backup in Bolton? Plumbing Bolton handles the work cleanly and verifies everything is working right. Book today.

FAQ

The order of steps that keeps a Peel rebate claim valid questions

Can the valve go in before the Caledon permit arrives?
Not if you want the rebate. Peel's conditions put the Town permit and inspection ahead of the installation, so an early start means an inspector who never saw the open trench. Wait for the permit, then book the crew, and the floor is patched after the inspection.
Does a valve installed in 2023 qualify for the rebate?
No. Peel counts valves installed after July 16, 2024. An older valve still protects the basement, and the plumber can check that its flap moves freely, but a claim for it will be refused. A replacement valve installed now under a permit would qualify.
Is a backwater valve enough on its own against basement flooding?
It closes one path, the sewer. Groundwater through a stone wall, a failed sump pump or a downspout dumping beside the foundation need their own fixes. Peel's own advice pairs the valve with disconnected downspouts and soil graded away from the house.

Read next

Urgent Plumbing Repair, Installation & Maintenance Services

Call now

Get a free quote

Optional, but it helps: we can confirm we serve your street and give you a realistic arrival time.

We reply by phone as soon as we can.

Search